Rail
New Platform Waiting Room
Construction of a new Waiting Room extension, including refurbishment of existing accommodation on Platforms 2&3. The scheme was delivered on behalf of Govia Thameslink Railway to enhance customer experience at this busy commuter station & underground interchange and provide level access to the new waiting room facility for wheelchair users.
Works Comprised of:
- Complete strip of all existing services
- Construction of new extension
- Installation of new windows, roller shutter and DDA compliant entrance doors
- New electrical & CCTV installations
- New flooring & DDA matwell systems
- Installation of new seating
- Internal and external redecoration
| Project: | New Platform Waiting Room |
|---|---|
| Client: | GTR |
| Location: | Elephant & Castle Station, London |
| Contract Administrator: | GTR |
| Date: | March 2019 |
Refurbishment of two Platform Waiting Rooms
While the Crossrail Project is creating significant new infrastructure through Central London and is providing some new station buildings along the surface sections to the east and west, many of the existing stations between Reading and Shenfield will not be materially improved by the Crossrail project, which will be known as the Elizabeth Line once operational.
Transport for London (TfL) has therefore developed its ‘On Network Stations Improvement Programme’, known as ONSIP, to remodel and upgrade many of the existing surface stations to provide an improved passenger experience and create a unified look and feel for the Elizabeth Line, along with removing clutter and redundant assets.
These improvements are delivered by the Train Operator MTR Crossrail on behalf of TfL. MTR Crossrail hold the current concession contract for the operation of the Elizabeth Line trains and stations.
Works Comprised of:
- Installation of new windows and DDA compliant entrance doors
- New electrical & CCTV installations
- New flooring & DDA matwell systems
- Installation of new seating
- Internal and external redecoration
| Project: | Refurbishment of two Platform Waiting Rooms |
|---|---|
| Client: | MTR |
| Location: | Iver Station, Buckinghamshire |
| Contract Administrator: | MTR |
| Date: | March 2019 |
Building & Car Park Refurbishment Works
The project will provide March Station with a newly refurbished station building providing up to date compliant facilities including larger waiting rooms and suitably sized toilets. This will bring currently unused and gradually degrading areas of the station back into use and improve its general state of repair.
The scheme is being delivered by Greater Anglia in conjunction with Fenland District Council. The scheme was to extend the existing car park within the lease boundary and reconfigure the existing arrangements to introduce a new compliant car park layout. There is existing land within the lease boundary that is not in use, this land will require heavy de-vegetation along with substantial compacted infill to allow suitable surfacing to be installed. The existing historic siding will require demolition to allow for a suitably graded car park. There is a requirement to install additional lighting, CCTV and re-routing of the existing incoming telecoms supply. Renew al of foul and surface water drainage systems from the station building and car park areas to the mains services in station road.
Works Comprised of:
Design development, full strip out, substantial structural alterations and refurbishment of the complete station building comprising of:
New staff welfare facilities, ticket office, booking hall, waiting room, public toilets and retail unit
| Project: | Building & Car Park Refurbishment Works |
|---|---|
| Client: | Greater Anglia |
| Location: | March Station, Cambridgeshire |
| Contract Administrator: | Greater Anglia |
| Date: | March 2022 |
Building & Car Park Refurbishment Works
The scheme was to extend the existing car park within the lease boundary and reconfigure the existing arrangements to introduce a new compliant car park layout. There is existing land within the lease boundary that is not in use, this land will require heavy de-vegetation along with substantial compacted infill to allow suitable surfacing to be installed. The existing historic siding will require demolition to allow for a suitably graded car park. Installation on a new lighting, CCTV and re-routing of the existing incoming UKPN and telecoms supplies.
Works Comprised of:
- Complete site clearance and levelling.
- Relocation UKPN & Openreach services
- Ground stabilisation works
- Installation of attenuation and completely new drainage systems from the station building and new car park areas to mains services
- Installation of new feeder pillar, power, lighting, and CCTV Services.
| Project: | Building & Car Park Refurbishment Works |
|---|---|
| Client: | Greater Anglia |
| Location: | Attleborough Station, Norfolk |
| Contract Administrator: | Greater Anglia |
| Date: | March 2022 |
Complete Station Building Reconstruction
Saxmundham station building was severely damaged by fire in February 2018 destroying the whole upper floor which has collapsed into the internal walls of the building.
After negotiations with the local authorities, it has been agreed that the station building will be rebuilt without the upper level to leave a single storey building suitable for rail users and for rail operational use.
Works Comprised of:
- Complete clearance of the station building contents and debris
- Removal of the first-floor construction and reduce building to single a single-story structure
- Rebuild external and internal brickwork
- Installation of structural steel works.
- Design and installation of new timber trussed roof and coverings
- Rebuild both platform and main station entrance canopies
- External repairs
- Complete station building rewire
- Form new customer waiting room and complete fit out works.
| Project: | Complete Station Building Reconstruction |
|---|---|
| Client: | Greater Anglia |
| Location: | Saxmundham Station |
| Contract Administrator: | Greater Anglia |
| Date: | September 2020 |
Internal Refurbishment of Station Waiting Room
Tottenham Hale station has a requirement to increase its services to meet the minimum standards and require the following works: to include DDA door access, Workstation area new flooring and Redecoration. It will also offer passengers the opportunity to charge laptops, mobile phones and work whilst they wait.
The room will also benefit by extending the retail to the existing Pumpkin area which will be vacated in order for a new Starbucks.
Works Comprised of:
- Complete strip out of existing facilities, fixtures, and fittings.
- Installation of new DDA compliant door entrance systems.
- Installation of new M&E and CCTV services
- Fabrication and Installation of new customer workstations
- Installation of new bench seating
- New floor coverings and entrance matting
- Complete redecoration
| Project: | Internal Refurbishment of Station Waiting Room |
|---|---|
| Client: | Greater Anglia |
| Location: | Tottenham Hale Station, London |
| Contract Administrator: | Greater Anglia |
| Date: | March 2021 |
Station Car Park Extension & Remodelling
The scheme was to extend the existing car park within the lease boundary and reconfigure the existing arrangements to introduce a new compliant car park layout. There is existing land within the lease boundary that is not in use, this land will require heavy de-vegetation along with substantial compacted infill to allow suitable surfacing to be installed. The existing historic siding will require demolition to allow for a suitably graded car park. There is a requirement to install additional lighting, CCTV and re-routing of the existing incoming telecoms supply.
Works Comprised of:
- Complete site clearance
- Relocation UKPN & Openreach services
- Installation of permeable drainage system
- New feeder pillar, power, lighting, and CCTV services
- Permeable tarmacadam surfacing.
- New perimeter fencing and installation of Armco barrier systems
| Project: | Station Car Park Extension & Remodelling |
|---|---|
| Client: | Greater Anglia |
| Location: | Saxmundham Station |
| Contract Administrator: | Greater Anglia |
| Date: | September 2020 |
ATG & Retail Pod Enabling Works
This project comprised of the installation of new automatic ticket gate machines including new purpose made retail pod units.
The objective of this project is to carry out the Automatic Gate line renewal works under the NSIP programme at Norwich Railway Station.
The scheme aimed to improve passenger flow through the concourse areas and create improved circulation. This will involve remodelling of the concourse by renewing the gate line for a more capable system and also remodelling the gate line layout by creating a single gate array of 10 gates central to the concourse giving better access to all platforms. The existing retail pod will be decommissioned and removed from the concourse to allow for the new gate line position. Ground works for duct routes and services will be installed in this phase for works to cater for future construction in this area.
Works Comprised of:
- Complete removal of all existing retail pods, automatic gateline barriers and associated services.
- Installation of new services ducting.
- Terrazzo repairs/reinstatement
- Installation of new Automatic gateline barrier system
- Installation of two new retail pods
- Installation of new customer information pod
- Alterations
- Relocation TVM’s& ATM machines
- Installation of new platform barrier system, complete with vehicular access gates.
- Installation of new power and lighting services
- Installation of new containment routes as required to link the ATGs to power and comms distribution points.
- Upgrade CCTV coverage.
| Project: | ATG & Retail Pod Enabling Works |
|---|---|
| Client: | Abellio Greater Anglia |
| Location: | Norwich Station |
| Contract Administrator: | Abellio Greater Anglia |
| Date: | September 2015 |
Internal & External Refurbishment of Station Building
Billericay Station is being modernised and rebuilt to incorporate new facilities, as part of the improvement there is a requirement to install two new automatic gate lines – one on the main station concourse and the other at Platform 2 for the Car Park entrance.
Main Concourse:
- Enabling works for the installation of new automatic ticket gateline barrier system
- Replacement of all electrical, data and CCTV conduits and containment.
- Upgrade existing power and lighting installations.
- Installation of new CCTV
- Installation of new automatic roller shutter
Car Park:
- Design and build new external automatic ticket gateline barrier system enclosure, including all associated M&E works.
| Project: | Internal & External Refurbishment of Station Building |
|---|---|
| Client: | Abellio Greater Anglia |
| Location: | Billericay Station |
| Contract Administrator: | Abellio Greater Anglia |
| Date: | July 2016 |
National Station Improvement Project
The scheme forms part of the NSIP programme remit to make a noticeable and lasting improvement for the benefit of passengers at Abellio Greater Anglia stations. These works will incorporate the third phase of the planned works across the station. To convert a former customer information office to a customer waiting room facility.
Works Comprised of the following:
- Complete strip out of the existing facility.
- Installation of new power, lighting, air conditioning, CCTV & CIS equipment
- New floor, wall and ceiling finishes
- Installation of new automatic door entry system
| Project: | National Station Improvement Project |
|---|---|
| Client: | Abellio Greater Anglia |
| Location: | Norwich Station |
| Contract Administrator: | Abellio Greater Anglia |
| Date: | May 2016 |
Retail
New Retail Pod Installation Works
This project comprised of the enabling works and installation of new purpose made retail pod units.
Works Comprised of:
- Complete removal of all existing retail pods, automatic gateline barriers and associated services.
- Installation of new services ducting.
- Terrazzo repairs/reinstatement
- Installation of new Automatic gateline barrier system
- Installation of two new retail pods
- Installation of new customer information pod
- Relocation TVM’s & ATM machines
- Installation of new platform barrier system, complete with vehicular access gates.
- Installation of new power and lighting services
- Installation of new containment routes.
- Upgrade CCTV coverage.
| Project: | New Retail Pod Installation Works |
|---|---|
| Client: | SRL |
| Location: | Norwich Station |
| Contract Administrator: | SRL |
| Date: | September 2015 |
Commercial
New Carpentry & Joinery Works

- New build – First & Second fix carpentry & joinery works.
- Construction of Reception, Gathering Hall & Woodland Hall.
| Project: | New Carpentry & Joinery Works |
|---|---|
| Client: | May Gurney |
| Location: | Epping Forest Burial Ground |
| Contract Administrator: | Out of Nowhere |
| Designer / Engineer: | Out of Nowhere |
| Date: | March 2012 |
Complete Toilet Refurbishment
To undertake the complete refurbishment of the existing toilet facilities including all associated M&E works.
| Project: | Complete Toilet Refurbishment |
|---|---|
| Client: | Polydeck Limited |
| Location: | Bristol Office |
| Contract Administrator: | Polydeck Limited |
| Date: | February 2015 |
LEISURE
Secure Cycle Station
To undertake the complete fit out works to three levels of a new multi storey cycle parking facility within the new Cambridge Station Ibis Hotel Cycle Point opens its doors for the first time on February 15 2016, providing safe and secure parking in the largest facility of its type at a UK rail station. With on-site maintenance, cycle hire and a cycle shop all under one roof, this innovative project is the culmination of a programme of design, collaboration and construction between ourselves and partners, Network Rail, developers Brookgate and teams of contractors.
Cycle Point will open in three phases, the first providing parking for more than 1500 cycles on the ground and first floor from 15 February. In March, the second floor will open, bringing Cycle Point up to full capacity. The final phase will see the opening of the cycle shop, in March or April.
On completion, the Cycle Point will provide parking for over 2850 cycles over three floors, will be free to use, open 24/7 and feature state of the art CCTV and customer help points.
| Project: | Secure Cycle Station |
|---|---|
| Client: | Abellio |
| Location: | Ibis Hotel Cambridge Station |
| Contract Administrator: | Abellio |
| Date: | March 2016 |
Complete Toilet Refurbishment
To undertake the complete refurbishment of the existing toilet facilities including all associated M&E works.
| Project: | Complete Toilet Refurbishment |
|---|---|
| Client: | Fitness First |
| Location: | Gracechurch Street London |
| Contract Administrator: | Gracechurch Street London |
| Date: | February 2015 |
Residential
Refurbishment of Two Existing Cottages
Complete refurbishment of two existing cottages
Works Comprised of:
- Complete internal strip out, including studwork walls, ceilings and second fix carpentry
- Internal structural alterations
- Construction of single-story rear extensions
- Complete renewal of electrical and mechanical installations
- Installation of new windows and doors
- Installation of new staircases
- Complete internal fit out
- Garden landscaping
- Internal and external redecoration
Construction of Eight New Dwellings Including Infrastructure Works
Construction of eight new dwellings, including associated infrastructure works
Works Comprised of:
As above, show home fitted out by others.
Part Refurbishment of Former Station Keepers Cottage
Ingatestone Crossing Keepers Cottage was constructed by the Eastern Counties Railway in 1854. The building had been in regular use until the mid-1980’s. Since then, little use has been made of the cottage due its small footprint and repairs being required to the fabric of building.
TPSS were instructed to undertake the works listed below. The future works proposed and not part of this project is to refurbish and restore the building and convert its use to local railway and village community museum. These works are due to be undertaken by the railway heritage trust.
Works Comprised of:
- Stripping existing roof finishes including underfelts and roofing battens
- Complete renewal of structural roof timbers.
- Installation of new roof tiles including breathable membrane, roofing battens and insulation
- Reconstructing 3 no. chimney stacks to their original profiles
- Replacement of rainwater goods.
- Refurbishment of external lean-to toilet facility
- Installation of new water mains
- Inspect and overhaul surface water drainage systems
- Reduce adjoining ground levels
Education
Main School Entrance Extension
Extension and refurbishment of main school entrance
Works Comprised of:
- Strip out works
- Structural alterations
- Construction of extension
- Installation of new curtain walling an entrance door
- Construction of new entrance stairs, landing and handrail system
- Landscaping, paving and resurfacing works
- Internal refurbishment work
Pupils Toilet Refurbishment
Complete refurbishment of existing pupil’s toilet facilities.
Works Comprised of:
- Complete strip out of existing fixtures, fittings, and M&E services
- Minor structural alterations
- Alterations and adaptions to drainage and mains water services
- New wall tiling
- Installation of new sanitary and brassware
- Installation of new suspended ceiling and lighting
- New floor coverings
- Redecoration
Catering Kitchen Refurbishment
Enlargement and complete refurbishment of existing catering kitchen, including renewal of all M&E services.
Works Comprised of:
- Complete strip out of existing fixtures, fittings, appliances, and M&E services.
- Removal of internal partition walls.
- Installation of new mechanical, electrical, water, drainage, and ventilation systems.
- Installation of hygiene wall cladding
- Installation of new hygiene suspended ceiling system
- New safety flooring
- Installation of new doors and windows.
- Redecoration works.
Gym Block Refurbishment Works
This project comprised of the complete internal and external refurbishment of the existing Gym Block.
The Works Comprised of:
- Removal of existing roof covering, concrete copings, soffits, rooflights, and rainwater goods, installation of new insulated roof coverings.
- Removal of all internal and external windows, doors and curtain walling and the installation of new.
- Asbestos removal.
- External Walls – Repairs to existing concrete lintels, facing brickwork and construction of over cladding to side elevation with composite materials.
- Removal of existing M&E systems and the installation of new
- Removal of existing timber ramp and railings, and construction of new
- Complete redecoration
- New floor coverings.