Projects

Rail

ATG & Retail Pod Enabling Works

This project comprised of the installation of new automatic ticket gate machines including new purpose made retail pod units.

The objective of this project is to carry out the Automatic Gate line renewal works under the NSIP programme at Norwich Railway Station.

The scheme aimed to improve passenger flow through the concourse areas and create improved circulation. This will involve remodelling of the concourse by renewing the gate line for a more capable system and also remodelling the gate line layout by creating a single gate array of 10 gates central to the concourse giving better access to all platforms.  The existing retail pod will be decommissioned and removed from the concourse to allow for the new gate line position.  Ground works for duct routes and services will be installed in this phase for works to cater for future construction in this area.

  • ATG & Retail Pod Enabling Works
  • ATG & Retail Pod Enabling Works
  • ATG & Retail Pod Enabling Works

Works Comprised of:

  • Complete removal of all existing retail pods, automatic gateline barriers and associated services.
  • Installation of new services ducting.
  • Terrazzo repairs/reinstatement
  • Installation of new Automatic gateline barrier system
  • Installation of two new retail pods
  • Installation of new customer information pod
  • Alterations
  • Relocation TVM’s& ATM machines
  • Installation of new platform barrier system, complete with vehicular access gates.
  • Installation of new power and lighting services
  • Installation of new containment routes as required to link the ATGs to power and comms distribution points.
  • Upgrade CCTV coverage.
Project:ATG & Retail Pod Enabling Works
Client:Abellio Greater Anglia
Location:Norwich Station
Contract Administrator:Abellio Greater Anglia
Date:September 2015
Contract Value:156K
Contract Period:12 Weeks

Internal & External Refurbishment of Station Building

  • Internal & External Refurbishment of Station Building
  • Internal & External Refurbishment of Station Building
  • Internal & External Refurbishment of Station Building
  • Internal & External Refurbishment of Station Building

  • Internal refurbishment of the station passenger overbridge, lift vestibule, public & staff toilet facilities and booking hall areas.
  • Complete replacement of internal station lighting.
  • Relocation of mains supplies and distribution boards.
  • Installation of new CCTV to new communal areas, including upgrading existing installation.
  • Replacement of timber fascia and soffits to station entrance elevations.
  • Construction of new disabled car park area.
  • Replacement of platform waiting shelters.
  • Enabling works for new DDA compliant ATG installation.
  • Mechanical preparation and waxing of existing timber clad soffits.
Project:Internal & External Refurbishment of Station Building
Client:National Express East Anglia
Location:Harlow Town Station
Contract Administrator:Vextrix Management
Date:March 2011
Contract Value:250K
Contract Period:12 Weeks

Internal & External Refurbishment of Station Building

Billericay Station is being modernised and rebuilt to incorporate new facilities, as part of the improvement there is a requirement to install two new automatic gate lines – one on the main station concourse and the other at Platform 2 for the Car Park entrance.

  • Internal & External Refurbishment of Station Building
  • Internal & External Refurbishment of Station Building

Main Concourse:

  • Enabling works for the installation of new automatic ticket gateline barrier system
  • Replacement of all electrical, data and CCTV conduits and containment.
  • Upgrade existing power and lighting installations.
  • Installation of new CCTV
  • Installation of new automatic roller shutter

Car Park:

  • Design and build new external automatic ticket gateline barrier system enclosure, including all associated M&E works.
Project:Internal & External Refurbishment of Station Building
Client:Abellio Greater Anglia
Location:Billericay Station
Contract Administrator:Abellio Greater Anglia
Date:July 2016
Contract Value:180K
Contract Period:12 Weeks

National Station Improvement Project

  • National Station Improvement Project
  • National Station Improvement Project
  • National Station Improvement Project

The scheme forms part of the NSIP programme remit to make a noticeable and lasting improvement for the benefit of passengers at Abellio Greater Anglia stations. These works will incorporate the third phase of the planned works across the station. To convert a former customer information office to a customer waiting room facility.

Works Comprised of the following:

  • Complete strip out of the existing facility.
  • Installation of new power, lighting, air conditioning, CCTV & CIS equipment
  • New floor, wall and ceiling finishes
  • Installation of new automatic door entry system
Project:National Station Improvement Project
Client:Abellio Greater Anglia
Location:Norwich Station
Contract Administrator:Abellio Greater Anglia
Date:May 2016
Contract Value:25K
Contract Period:4 Weeks

Retail

New Retail Pod Installation Works

This project comprised of the enabling works and installation of new purpose made retail pod units.

  • New Retail Pod Installation Works
  • New Retail Pod Installation Works

Works Comprised of:

  • Complete removal of all existing retail pods, automatic gateline barriers and associated services.
  • Installation of new services ducting.
  • Terrazzo repairs/reinstatement
  • Installation of new Automatic gateline barrier system
  • Installation of two new retail pods
  • Installation of new customer information pod
  • Relocation TVM’s & ATM machines
  • Installation of new platform barrier system, complete with vehicular access gates.
  • Installation of new power and lighting services
  • Installation of new containment routes.
  • Upgrade CCTV coverage.
Project:New Retail Pod Installation Works
Client:SRL
Location:Norwich Station
Contract Administrator:SRL
Date:September 2015
Contract Value:156K
Contract Period:4 Weeks

Commercial

New Carpentry & Joinery Works

New Carpentry & Joinery Works
  • New build – First & Second fix carpentry & joinery works.
  • Construction of Reception, Gathering Hall & Woodland Hall.
Project:New Carpentry & Joinery Works
Client:May Gurney
Location:Epping Forest Burial Ground
Contract Administrator:Out of Nowhere
Designer / Engineer:Out of Nowhere
Date:March 2012
Contract Value:243K
Contract Period:16 Weeks

Complete Toilet Refurbishment

  • Complete Toilet Refurbishment
  • Complete Toilet Refurbishment
  • Complete Toilet Refurbishment

To undertake the complete refurbishment of the existing toilet facilities including all associated M&E works.

Project:Complete Toilet Refurbishment
Client:Polydeck Limited
Location:Bristol Office
Contract Administrator:Polydeck Limited
Date:February 2015
Contract Value:48K
Contract Period:4 Weeks

LEISURE

Secure Cycle Station

To undertake the complete fit out works to three levels of a new multi storey cycle parking facility within the new Cambridge Station Ibis Hotel Cycle Point opens its doors for the first time on February 15 2016, providing safe and secure parking in the largest facility of its type at a UK rail station. With on-site maintenance, cycle hire and a cycle shop all under one roof, this innovative project is the culmination of a programme of design, collaboration and construction between ourselves and partners, Network Rail, developers Brookgate and teams of contractors.

  • TPSS - Leisure: Secure Cycle Station
  • TPSS - Leisure: Secure Cycle Station
  • TPSS - Leisure: Secure Cycle Station
  • TPSS - Leisure: Secure Cycle Station
  • TPSS - Leisure: Secure Cycle Station

Cycle Point will open in three phases, the first providing parking for more than 1500 cycles on the ground and first floor from 15 February. In March, the second floor will open, bringing Cycle Point up to full capacity. The final phase will see the opening of the cycle shop, in March or April.

On completion, the Cycle Point will provide parking for over 2850 cycles over three floors, will be free to use, open 24/7 and feature state of the art CCTV and customer help points.

Project:Secure Cycle Station
Client:Abellio
Location:Ibis Hotel Cambridge Station
Contract Administrator:Abellio
Date:March 2016
Contract Value:300K
Contract Period:16 Weeks

Complete Toilet Refurbishment

  • Complete Toilet Refurbishment
  • Complete Toilet Refurbishment

To undertake the complete refurbishment of the existing toilet facilities including all associated M&E works.

Project:Complete Toilet Refurbishment
Client:Fitness First
Location:Gracechurch Street London
Contract Administrator:Gracechurch Street London
Date:February 2015
Contract Value:37K
Contract Period:4 Weeks